| STREET CUT FEE SCHEDULE | ||
| TYPE | AMOUNT | |
| Permit | Flat Fee | $25.00 |
| Public Works will do Actual Costs, and Administrative Fee to inspect. | ||
| WATER CONNECTION FEE SCHEDULE | ||
| LINE SIZE | TAP FEE | |
| 3/4" | $1,000.00 | |
| 1" | $1,800.00 | |
| 1 1/2" | $4,000.00 | |
| 2" | $7,000.00 | |
| 3" | $10,000.00 | |
| 4" | $15,000.00 | |
| 6" | $30,000.00 | |
| 8" | $45,000.00 | |
| 10" | $60,000.00 | |
| SANITARY SEWER CONNECTION DEVELOPMENT FEES | ||
| Single Family Dwelling | ||
| Tap Size | Tap Fee | |
| 3" | $1,000.00 | |
| 4" | $1,000.00 | |
| Multi-Unit Complex | ||
| Tap Size | Tap Fee | |
| 4" | $2,500.00 | |
| 6" | $2,500.00 | |
| 8" | $2,500.00 | |
| Each Additional Toilet | $300.00 | |
| RV park & Trailer Court Space | ||
| Connections | $300.00 | |
| Commercial and Industrial | ||
| Tap Size | Tap Fee | |
| 4" | $2,500.00 | |
| 6" | $5,000.00 | |
| 8" | $10,000.00 | |
| Storm Sewer Connection Development Fees | ||
| Tap Size | Tap Fee | |
| 4" | $200.00 | |
| 6" | $450.00 | |
| 8" | $600.00 | |
| 10" | $750.00 | |
| 12" | $900.00 | |
| Connection Surcharges | ||
| To defray the cost of installing meters and making the physical water and sewer taps, the following | ||
| surcharges shall be added to the development fees. | ||
| A. For all meters on water services, the actual cost of labor, materials and equipment; | ||
| B. For meter pit and cover installations, and for pit excavation and backfill if the meter is located in a pit | ||
| or vault, the actual cost of labor, materials, and equipment if not provided by the owner; | ||
| C. For all meters on fire protection lines, the actual cost of labor, materials and equipment; | ||
| D. For all connections provided on sanitary and storm sewer systems, the actual cost of labor, materials | ||
| and equipment. (This applies to all water and sewer connections.) | ||
| Fire Protection Tap Fees | ||
| Tap Size | Main Line Size | Tap Fee Charge |
| 4" or Less | 6" through 12" | $500.00 |
| 4" or Less | 16" through 24" | $650.00 |
| 4" or Less | Over 24" | $750.00 |
| 6" | 6" through 12" | $750.00 |
| 6" | 16" through 24" | $900.00 |
| 6" | Over 24" | $1,100.00 |
| 8" | 8" through 12" | $850.00 |
| 8" | 16" through 24" | $1,100.00 |
| 8" | Over 24" | $1,250.00 |
| 12" | 12" | $1,200.00 |
| 12" | 16" through 24" | $1,400.00 |
| 12" | Over 24" | $1,600.00 |
| Wastewater Treatment Plan Fees | ||
| Per 1000 Gallons in County | $45.00 | |
| Per 1000 Gallons Out-Of-County | $60.00 | |
| Metered/Backflow Assembly Rental | $10.00 per day | |